This page covers 43 projects with 28,104 homes, as of 22 Oct 2026. Of these projects, 12 are finished and 31 are under construction.
Its registered name is Damac Crescent Properties. This is not its full portfolio. Compare prices below. You can also track build progress.
Talk to DAMAC- Finished projects
- 12
- Register to 22 Oct 2026
- Under construction
- 31
- 8% average completion
- Registered sales
- 8,573
- Across registered projects
Compare registered sales across projects
Compare prices at buildings linked to these projects by name.
| Damac District | DAMAC Hills | 1,817 | 399 | 100.0% | |
| Damac Islands 2 – Bahamas 1 | Al Yelayiss 1 | 1,822 | 275 | 100.0% | |
| Damac Islands 2 – Bahamas 2 | Al Yelayiss 1 | 1,822 | 254 | 100.0% | |
| Damac Islands 2 – Bermuda | Al Yelayiss 1 | 1,872 | 204 | 100.0% | |
| Damac Islands 2 – Cuba | Al Yelayiss 1 | 1,772 | 173 | 100.0% | |
| Damac Islands 2 – Maui | Al Yelayiss 1 | 1,872 | 139 | 100.0% | |
| Damac Riverside – Olive | Dubai Investment Park Second | 1,744 | 125 | 100.0% | |
| Damac Islands 2 – Barbados 2 | Al Yelayiss 1 | 1,822 | 120 | 100.0% | |
| Damac Islands 2 – Barbados 1 | Al Yelayiss 1 | 1,841 | 119 | 100.0% | |
| Damac Islands 2 – Tahiti 2 | Al Yelayiss 1 | 1,822 | 112 | 100.0% | |
| Chelsea Residences 2 By Damac | Dubai Maritime City | 3,202 | 103 | 100.0% | |
| Damac Islands 2 – Tahiti 1 | Al Yelayiss 1 | 1,822 | 93 | 100.0% | |
| Damac Towers By Paramount | Business Bay | 1,412 | 89 | 0.0% | |
| Damac Riverside Views – Capri 2 | Dubai Investment Park Second | 1,486 | 76 | 100.0% | |
| Damac Hills – Carson | DAMAC Hills | 1,356 | 73 | 0.0% | |
| Damac Riverside Views – Azure 2 | Dubai Investment Park Second | 1,430 | 66 | 100.0% | |
| Damac Hills – Golf Greens 2 | DAMAC Hills | 1,658 | 64 | 100.0% | |
| Chelsea Residences By Damac | Dubai Maritime City | 3,120 | 61 | 100.0% | |
| Aykon City | Business Bay | 1,602 | 60 | 0.0% | |
| Damac Riverside Views – Capri 1 | Dubai Investment Park Second | 1,461 | 60 | 100.0% | |
| Ghalia | Jumeirah Village Circle | 1,185 | 60 | 0.0% | |
| Damac Riverside Views – Marine 4 | Dubai Investment Park Second | 1,441 | 51 | 100.0% | |
| Damac Hills – Golf Gate | DAMAC Hills | 1,526 | 48 | 0.0% | |
| Celestia | Dubai South | 1,112 | 47 | 0.0% | |
| Damac Riverside Views – Marine 3 | Dubai Investment Park Second | 1,418 | 47 | 100.0% | |
| The Crescent | International Media Production Zone | 842 | 43 | 0.0% | |
| Aykon City 2 | Business Bay | 1,768 | 34 | 0.0% | |
| Aykon City 3 | Business Bay | 2,517 | 32 | 100.0% | |
| Lago Vista | International Media Production Zone | 751 | 31 | 0.0% | |
| Damac Hills – Artesia | DAMAC Hills | 1,292 | 28 | 0.0% | |
| Damac Hills – Golf Promenade | DAMAC Hills | 1,222 | 27 | 0.0% | |
| Damac Riverside Views – Indigo 1 | Dubai Investment Park Second | 1,436 | 23 | 100.0% | |
| Damac Riverside Views – Marine 2 | Dubai Investment Park Second | 1,437 | 21 | 100.0% | |
| Damac Riverside Views – Royal 1 | Dubai Investment Park Second | 1,575 | 18 | 100.0% | |
| Damac Riverside Views – Royal 2 | Dubai Investment Park Second | 1,578 | 16 | 100.0% |
Source: Land Department open data. Buildings need at least ten sales in the twelve months to 5 Oct 2026. Medians describe the sold mix of homes; they are not a same-size price ranking or asking-price quote. Projects without a building name match or an adequate recent sample are omitted from this comparison. A name match alone does not confirm project identity. Confirm the DLD project and unit before relying on a match. Their register records remain below. Compare the home-size table on each building page before choosing a unit.
Get advice on a DAMAC home
Tell us what you need. With your consent, we share your request with the developer or agent for DAMAC, who may contact you about it.
Thanks, the details are added to your request.
Under construction
Compare the recorded progress and completion dates for DAMAC projects still being built.
Damac Islands – Seychelles 2
Damac Islands – Bali 3
Damac Riverside Views – Royal 3&4
Damac Hills – Ivory
Damac Riverside Views – Marine 1
Project register details
| Project | Community | Homes | Complete | Registered completion | Escrow bank | Median AED per sq ft |
|---|---|---|---|---|---|---|
| Damac Islands 2 – Antigua 1 | – | 468 | 0% | 31 Dec 2030 | Mashreq Bank Psc | 1,932 |
| Damac Islands 2 – Bahamas 2 | Al Yelayiss 1 | 666 | 0% | 30 Jun 2030 | First Abu Dhabi Bank P.J.S.C. | 1,822 |
| Damac Islands 2 – Bahamas 1 | Al Yelayiss 1 | 544 | 0% | 30 Jun 2030 | First Abu Dhabi Bank P.J.S.C. | 1,822 |
| Damac Islands 2 – Cuba | Al Yelayiss 1 | 540 | 0% | 30 Jun 2030 | Mashreq Bank Psc | 1,772 |
| Damac Islands 2 – Bermuda | Al Yelayiss 1 | 469 | 0% | 30 Jun 2030 | First Abu Dhabi Bank P.J.S.C. | 1,822 |
| Damac Islands 2 – Tahiti 2 | Al Yelayiss 1 | 484 | 0% | 30 Jun 2030 | Mashreq Bank Psc | 1,808 |
| Damac Islands 2 – Maui | Al Yelayiss 1 | 434 | 0% | 30 Jun 2030 | First Abu Dhabi Bank P.J.S.C. | 1,872 |
| Damac Islands 2 – Barbados 1 | Al Yelayiss 1 | 382 | 0% | 30 Jun 2030 | Mashreq Bank Psc | 1,822 |
| Damac Islands 2 – Barbados 2 | Al Yelayiss 1 | 362 | 0% | 30 Jun 2030 | Mashreq Bank Psc | 1,822 |
| Damac Islands 2 – Tahiti 1 | Al Yelayiss 1 | 306 | 0% | 30 Jun 2030 | Mashreq Bank Psc | 1,822 |
| Chelsea Residences 2 By Damac | Dubai Maritime City | 958 | 5% | 31 Dec 2029 | Abu Dhabi Commercial Bank | 3,203 |
| Chelsea Residences By Damac | Dubai Maritime City | 703 | 5% | 31 Dec 2029 | Dubai Islamic Bank (Public Joint Stock Company) | 3,056 |
| Damac Islands – Seychelles 2 | – | 474 | 3% | 30 Jun 2029 | Emirates Nbd Bank (P.J.S.C) | – |
| Damac Islands – Bali 3 | – | 274 | 3% | 30 Jun 2029 | Emirates Nbd Bank (P.J.S.C) | – |
| Damac Riverside Views – Azure 2 | Dubai Investment Park Second | 720 | 6% | 31 Mar 2029 | Mashreq Bank Psc | 1,455 |
| Damac Riverside Views – Capri 1 | Dubai Investment Park Second | 824 | 8% | 31 Mar 2029 | Mashreq Bank Psc | 1,446 |
| Damac Riverside Views – Capri 2 | Dubai Investment Park Second | 576 | 8% | 31 Mar 2029 | Mashreq Bank Psc | 1,496 |
| Damac Riverside Views – Royal 3&4 | – | 466 | 13% | 31 Mar 2029 | Mashreq Bank Psc | 1,538 |
| Damac Riverside Views – Royal 1 | Dubai Investment Park Second | 335 | 14% | 31 Mar 2029 | Mashreq Bank Psc | 1,592 |
| Damac Riverside Views – Indigo 1 | Dubai Investment Park Second | 493 | 12% | 31 Mar 2029 | Mashreq Bank Psc | 1,531 |
| Damac Riverside Views – Royal 2 | Dubai Investment Park Second | 335 | 14% | 31 Mar 2029 | Mashreq Bank Psc | 1,571 |
| Damac Riverside Views – Indigo 2 | Dubai Investment Park Second | 388 | 12% | 31 Mar 2029 | Mashreq Bank Psc | 1,501 |
| Damac District | DAMAC Hills | 1,139 | 4% | 30 Mar 2029 | Mashreq Bank Psc | 1,824 |
| Damac Riverside – Olive | Dubai Investment Park Second | 208 | 5% | 30 Jun 2028 | Mashreq Bank Psc | 1,747 |
| Damac Hills – Ivory | DAMAC Hills | 103 | 1% | 30 Jun 2028 | Abu Dhabi Commercial Bank | – |
| Damac Riverside Views – Marine 2 | Dubai Investment Park Second | 358 | 12% | 31 May 2028 | First Abu Dhabi Bank P.J.S.C. | 1,476 |
| Damac Riverside Views – Marine 1 | – | 358 | 12% | 31 May 2028 | First Abu Dhabi Bank P.J.S.C. | 1,512 |
| Damac Riverside Views – Marine 4 | Dubai Investment Park Second | 276 | 21% | 31 May 2028 | First Abu Dhabi Bank P.J.S.C. | 1,441 |
| Damac Riverside Views – Marine 3 | Dubai Investment Park Second | 276 | 18% | 31 May 2028 | First Abu Dhabi Bank P.J.S.C. | 1,420 |
| Aykon City 3 | Business Bay | 1,300 | 31% | 30 Dec 2027 | Emirates Nbd Bank (P.J.S.C) | 2,524 |
| Damac Hills – Golf Greens 2 | DAMAC Hills | 606 | 45% | – | Abu Dhabi Commercial Bank | 1,665 |
Source: the Land Department's project register, 22 Oct 2026. The table shows the recorded status and dates for these projects.
Finished projects
The register records below show the start and completion dates for finished DAMAC projects.
Project register details
| Project | Community | Homes | Started | Completed | Build time | Median AED per sq ft |
|---|---|---|---|---|---|---|
| Damac Hills – Golf Gate | DAMAC Hills | 351 | 3 May 2022 | 15 Dec 2024 | 31 months | 1,526 |
| Aykon City 2 | Business Bay | 986 | 1 Jul 2016 | 12 Oct 2023 | 87 months | 1,814 |
| Aykon City | Business Bay | 1,231 | 1 Jul 2016 | 30 Aug 2023 | 85 months | 1,646 |
| Damac Hills – Carson | DAMAC Hills | 1,575 | 1 Mar 2015 | 29 Mar 2022 | 84 months | 1,364 |
| Damac Hills – Golf Vita | DAMAC Hills | 510 | 22 Oct 2017 | 15 Mar 2021 | 41 months | 1,512 |
| Damac Hills – Artesia | DAMAC Hills | 1,246 | 1 Aug 2014 | 10 Jan 2021 | 77 months | 1,270 |
| Damac Hills – Golf Promenade | DAMAC Hills | 741 | 1 Aug 2014 | 15 Sept 2019 | 61 months | 1,252 |
| Celestia | Dubai South Residential District | 974 | 1 Jun 2014 | 7 Aug 2019 | 62 months | 1,118 |
| Ghalia | Jumeirah Village Circle | 743 | 1 Jun 2014 | 28 Mar 2019 | 57 months | 1,179 |
| Damac Towers By Paramount | Business Bay | 2,041 | 27 Mar 2008 | 23 Oct 2018 | 127 months | 1,434 |
| Lago Vista | International Media Production Zone | 1,018 | 14 Feb 2007 | 27 Jan 2011 | 47 months | 827 |
| The Crescent | International Media Production Zone | 863 | 11 Jul 2006 | 25 Dec 2008 | 29 months | 832 |
Source: the Land Department's project register, 22 Oct 2026. The table shows the recorded start and finish dates.
Registered sales at matched project buildings
These home sales are for buildings linked to projects in the register. Each row shows the sale period.
| DAMAC Hills | Active | 399 | 12 months | 1,817 | 100.0% | Studio: 97 sales, median 799,000 AED; 1 bedroom: 248 sales, median 1,250,500 AED; 2 bedrooms: 47 sales, median 2,030,000 AED | |
| Al Yelayiss 1 | Active | 275 | 12 months | 1,822 | 100.0% | 4 bedrooms: 217 sales, median 2,825,000 AED; 5+ bedrooms: 58 sales, median 4,132,500 AED | |
| Al Yelayiss 1 | Active | 254 | 12 months | 1,822 | 100.0% | 4 bedrooms: 204 sales, median 2,824,000 AED; 5+ bedrooms: 50 sales, median 4,152,500 AED | |
| Al Yelayiss 1 | Active | 204 | 12 months | 1,872 | 100.0% | 4 bedrooms: 144 sales, median 2,903,000 AED; 5+ bedrooms: 60 sales, median 4,120,500 AED | |
| Al Yelayiss 1 | Active | 173 | 12 months | 1,772 | 100.0% | 4 bedrooms: 116 sales, median 2,824,000 AED; 5+ bedrooms: 57 sales, median 4,154,000 AED | |
| Al Yelayiss 1 | Active | 139 | 12 months | 1,872 | 100.0% | 4 bedrooms: 91 sales, median 2,903,000 AED; 5+ bedrooms: 48 sales, median 5,008,500 AED | |
| Dubai Investment Park Second | Active | 125 | 12 months | 1,744 | 100.0% | 4 bedrooms: 121 sales, median 2,703,000 AED; 5+ bedrooms: 4 sales, median 4,229,000 AED | |
| Al Yelayiss 1 | Active | 120 | 12 months | 1,822 | 100.0% | 4 bedrooms: 90 sales, median 2,825,000 AED; 5+ bedrooms: 30 sales, median 5,018,000 AED | |
| Al Yelayiss 1 | Active | 119 | 12 months | 1,841 | 100.0% | 4 bedrooms: 89 sales, median 2,835,300 AED; 5+ bedrooms: 30 sales, median 5,023,500 AED | |
| Al Yelayiss 1 | Active | 112 | 12 months | 1,822 | 100.0% | 4 bedrooms: 62 sales, median 2,828,500 AED; 5+ bedrooms: 50 sales, median 4,924,500 AED | |
| Dubai Maritime City | Active | 103 | 12 months | 3,202 | 100.0% | 1 bedroom: 89 sales, median 2,704,000 AED; 2 bedrooms: 10 sales, median 5,059,000 AED; 3 bedrooms: 4 sales, median 5,534,000 AED | |
| Al Yelayiss 1 | Active | 93 | 12 months | 1,822 | 100.0% | 4 bedrooms: 44 sales, median 2,825,000 AED; 5+ bedrooms: 49 sales, median 4,991,000 AED | |
| Business Bay | Finished | 89 | 12 months | 1,412 | 0.0% | Studio: 13 sales, median 864,467 AED; 1 bedroom: 34 sales, median 1,381,872 AED; 2 bedrooms: 24 sales, median 1,872,517 AED; 3 bedrooms: 17 sales, median 2,550,000 AED | |
| Dubai Investment Park Second | Active | 76 | 12 months | 1,486 | 100.0% | Studio: 15 sales, median 797,720 AED; 1 bedroom: 48 sales, median 1,242,500 AED; 2 bedrooms: 13 sales, median 2,108,960 AED | |
| DAMAC Hills | Finished | 73 | 12 months | 1,356 | 0.0% | Studio: 56 sales, median 552,500 AED; 1 bedroom: 12 sales, median 930,000 AED; 2 bedrooms: 5 sales, median 1,525,000 AED | |
| Dubai Investment Park Second | Active | 66 | 12 months | 1,430 | 100.0% | Studio: 7 sales, median 810,000 AED; 1 bedroom: 59 sales, median 1,244,000 AED | |
| DAMAC Hills | Active | 64 | 12 months | 1,658 | 100.0% | 1 bedroom: 38 sales, median 1,519,500 AED; 2 bedrooms: 26 sales, median 2,215,180 AED | |
| Dubai Maritime City | Active | 61 | 12 months | 3,120 | 100.0% | 1 bedroom: 38 sales, median 2,490,160 AED; 2 bedrooms: 17 sales, median 4,476,400 AED; 3 bedrooms: 6 sales, median 5,764,775 AED | |
| Business Bay | Finished | 60 | 12 months | 1,602 | 0.0% | Studio: 32 sales, median 703,816 AED; 1 bedroom: 17 sales, median 1,002,148 AED; 2 bedrooms: 5 sales, median 1,818,365 AED; 3 bedrooms: 6 sales, median 2,294,800 AED | |
| Dubai Investment Park Second | Active | 60 | 12 months | 1,461 | 100.0% | 1 bedroom: 57 sales, median 1,476,000 AED; 2 bedrooms: 3 sales, median 2,054,000 AED | |
| Jumeirah Village Circle | Finished | 60 | 12 months | 1,185 | 0.0% | Studio: 37 sales, median 550,000 AED; 1 bedroom: 14 sales, median 817,500 AED; 2 bedrooms: 9 sales, median 1,150,000 AED | |
| Dubai Investment Park Second | Active | 51 | 12 months | 1,441 | 100.0% | 1 bedroom: 40 sales, median 1,150,000 AED; 2 bedrooms: 11 sales, median 2,046,000 AED | |
| DAMAC Hills | Finished | 48 | 12 months | 1,526 | 0.0% | 1 bedroom: 36 sales, median 1,000,000 AED; 2 bedrooms: 12 sales, median 1,697,500 AED | |
| Dubai South Residential District | Finished | 47 | 12 months | 1,112 | 0.0% | Studio: 32 sales, median 522,500 AED; 1 bedroom: 9 sales, median 890,000 AED; 2 bedrooms: 5 sales, median 1,200,000 AED | |
| Dubai Investment Park Second | Active | 47 | 12 months | 1,418 | 100.0% | 1 bedroom: 34 sales, median 1,187,280 AED; 2 bedrooms: 13 sales, median 2,031,000 AED | |
| International Media Production Zone | Finished | 43 | 12 months | 842 | 0.0% | Studio: 32 sales, median 430,500 AED; 2 bedrooms: 9 sales, median 940,000 AED | |
| Business Bay | Finished | 34 | 12 months | 1,768 | 0.0% | Studio: 8 sales, median 840,000 AED; 1 bedroom: 3 sales, median 940,000 AED; 2 bedrooms: 21 sales, median 1,460,000 AED | |
| Business Bay | Active | 32 | 12 months | 2,517 | 100.0% | Studio: 3 sales, median 842,000 AED; 1 bedroom: 14 sales, median 1,803,500 AED; 2 bedrooms: 11 sales, median 3,137,696 AED; 3 bedrooms: 4 sales, median 4,299,675 AED | |
| International Media Production Zone | Finished | 31 | 12 months | 751 | 0.0% | Studio: 15 sales, median 420,000 AED; 1 bedroom: 3 sales, median 730,000 AED; 2 bedrooms: 12 sales, median 940,000 AED | |
| DAMAC Hills | Finished | 29 | 5 years | 1,525 | 0.0% | 1 bedroom: 28 sales, median 670,000 AED | |
| DAMAC Hills | Finished | 28 | 12 months | 1,292 | 0.0% | Studio: 14 sales, median 600,000 AED; 1 bedroom: 6 sales, median 1,047,500 AED; 2 bedrooms: 8 sales, median 1,577,500 AED | |
| DAMAC Hills | Finished | 27 | 12 months | 1,222 | 0.0% | Studio: 8 sales, median 595,000 AED; 1 bedroom: 9 sales, median 980,000 AED; 2 bedrooms: 5 sales, median 2,700,000 AED; 3 bedrooms: 5 sales, median 2,950,000 AED | |
| Dubai Investment Park Second | Active | 23 | 12 months | 1,436 | 100.0% | 1 bedroom: 5 sales, median 1,075,000 AED; 2 bedrooms: 18 sales, median 2,004,360 AED | |
| Dubai Investment Park Second | Active | 21 | 12 months | 1,437 | 100.0% | 1 bedroom: 14 sales, median 1,318,000 AED; 2 bedrooms: 7 sales, median 2,001,000 AED | |
| Dubai Investment Park Second | Active | 18 | 12 months | 1,575 | 100.0% | 1 bedroom: 8 sales, median 1,365,500 AED; 2 bedrooms: 10 sales, median 2,170,960 AED | |
| Dubai Investment Park Second | Active | 16 | 12 months | 1,578 | 100.0% | 1 bedroom: 10 sales, median 1,354,000 AED; 2 bedrooms: 6 sales, median 2,106,000 AED | |
| Dubai Investment Park Second | Active | 13 | 5 years | 1,479 | 100.0% | 2 bedrooms: 11 sales, median 2,012,000 AED |
Source: Dubai Land Department; data through 22 Oct 2026. Home-size medians come from each building's home sales. A row needs a project-to-building link for this developer in the existing register. That building must have at least 10 home sales in its published price window. Sales and home-size samples cover the matched building, not necessarily units sold by this developer. They are not the developer’s complete sales ledger.
Questions people ask about DAMAC
These answers explain the DAMAC project records and the coverage of this dataset.
How many DAMAC projects are covered by this dataset?
This page covers 43 projects with 28,104 homes. There are 12 finished projects and 31 under construction. Figures run to 22 Oct 2026.
Which projects has DAMAC registered?
Projects include: Damac Islands 2 – Antigua 1. Damac Islands 2 – Bahamas 2. Damac Islands 2 – Bahamas 1. Damac Islands 2 – Cuba. Damac Islands 2 – Bermuda. The lists above show each project's status as of 22 Oct 2026.
Which communities appear in DAMAC's project register?
Communities include: Al Yelayiss 1. Dubai Maritime City. Dubai Investment Park Second. DAMAC Hills. Business Bay. These names come from the project register, as of 22 Oct 2026.
How long does DAMAC take to build a project?
Its finished projects took a median 62 months to build. This runs from the registered start to finish.
Sources
Source update: 26 Oct 2026. Source for rents, yields and project records: Dubai Data (datadubai.ae), Continental Club Property, based on Dubai Land Department open data, data to 22 Oct 2026, licensed CC BY 4.0. Publisher contract sample, register data to 22 Oct 2026; the lease period is not stated. Publisher-reported gross yields use the publisher matched-segment sale-price denominator, not this page’s sale median; the matched-sale reporting period is not stated. Developers never pay to change these numbers.